Monday, December 24, 2012

Late December 2012 - Metal Element & Siding

Peter working with the positioning of the metal element mock-up that will be our house number.

This will be an "L-shaped" piece of Iron 12" tall with the house number cut in with a plasma cutter.
The porch light will illuminate through the house number from behind for that contemporary touch.

Thad Lefebvre, the metal fabricator, sent the first photo to show us the house numbers.

The sun shines through the sign onto the house.

First snow!!!  View out my new kitchen window.

First day of siding!!!  Christmas eve.......17 degree wind chill.....
CertainTeed cement board siding primed.

The pattern is one large, two small, one large, two small.   Now what color shall we paint it???




Friday, December 7, 2012

Early December 2012 - Windows and Shingles

The builder tells us we are on schedule and should be done in 90 DAYS!!!

High windows along the front of the house.

Master bedroom and bath.

The kitchen corner counter depth window......my favorite part of the house.

The front door.....it is full glass under the cardboard.

The big sliding glass door from the kitchen window side.   Garage window not in yet.

Sliding glass door over looking the bluff.

Maddie's room!!  :-)

Shingles are on and the last window in the garage installed.


Now it can snow......